cneec150.gif (3385 bytes) Projects in Metallurgy, Transportation and Other Industries

Nobil Group

 

DC motors for 2050 mm hot strip mill, Bao-steelFor metallurgy industry, in addition to contracting power plants and transmission & distribution facilities, CNEEC provides complete electric equipment for drive and control systems of 2050 mm hot – and 2030 mm cold-strip-mills and dim 140 seamless tube mill in Shanghai Baoshan Steel Complex (Baosteel). Some equipment like driving motors and motor control centers are jointly manufactured by Chinese factories with European companies, and have reached the world level.

35KV movable substation for mining areasFor communication and transportation, CNEEC supplies complete electric equipment for electrified railways, ports and wharfs. For example, CNEEC in cooperation with Japanese and German companies has provided power equipment for the second and third phase construction of the world-famous Qinhuangdao Coal Terminal.

power distribution & ilumination equipment for Quinhuangdao Coal TerminalFor excellent quality and best services in projects of Baosteel and the Coal Terminal, CNEEC has won 7 awards of the State Major Technical Equipment Achievement Prizes.

 

Home ] Brief Introduction ] Project Planning And Design ] Thermal Power Generation Projects ] Hydraulic Power Generation Projects ] Power Transmission and Distribution Projects ] Plant Construction and Modernization Projects ] [ Projects in Metallurgy, Transportation and Other Industries ] Welding Machines and Materials ] International Association ] Quality Control ] Major Experiences of CNEEC ]  [Back  to Nobil's Pag]