I.- Thermal Power Plant. A total of more than 100, including about 10 abroad

 

No. Project Capacity Scope of Services Year of Completion
1 Wood-chip-fried Co-gen PP for Menliguang Corp. Ltd., Indonesia 2x7 MW D & CES 1992
2 Bangase-fried Co-gen PP for Wang Kanai Sugar Mill, Thailand 2x6 MW D, CES & TS 1983
3 Co-gen PP for Manila Paper Mill, Philippines 2x6 MW D, CES & TS 1992
4 Pingwei PP, Anhui 2x600 MW organizing TT and 1991
5 Shiheng PP, Shandong 2x300 MW M of units 1988
6 Wanghua Co-gen PP of Fushun 1x1000+2x25 MW CES 1992
7 Co-gen PP for Qilu Petrochemical Co. 4x50 Mw and 2x50+2x25+2x12 CES 1989, 1992
8 PP in Guangzhou, Xutang, Heihe, etc. Unit capacity up to 50MW D & CES or CES only 1989-1991
9 Hegang PP, Heilnogjiang 2x25 MW D, CES & TS 1989
10 Co-gen PP for Dongguang Suggar Mill Guangdong 25 MW D & CES 1990
11 Coke-extinction Wate Heat Recovery PP of Baoshan Stell Complex 23 MW CES 1991
12 No.4 unit of Yangbaijing Geothermal Power Station, Tibet. 3 MW ES 1985

 

II.- Hydropower Station A total of nearly 100, including about 60 abroad

 

No. Project Capacity Scope of Services Year of Completion
1 Adiguzel and Karacaoren PP, Turkey 2x31.2, 2x23.6 MW head 116.102m Turn-key 1987-1992
2 9 PP in USA, eg Marsh Valley 1x6.8-1x0.11 MW, 13.4-93.9m Turn-key or CES 1983-1984
3 11 PP in Philippines, eg Baligatan 1x6-3x0.25 MW, 26-280m Turn-key or CES 1982-1987
4 5 PP in Phaililand, eg Huai Pa Rhao 2x2.3-2x0.09 MW, 50-270m Turn-key 1991-1992
5 13 PP in Peru, eg Tintacmarca 2x300-2x55 KW, 34-121.3m CES 1982-1983
6 8 PP in Sri Lanka, eg Kotiyagalla 1x165-1x24 KW, 17.5-138.5 m Turn-key or CES 1984-1985
7 Tatopani Hydropower Station, Nepal 4x250 KW, 88.6m Turn-key 1991
8 Gezhouba Hydropower Station 2x170+19x125 MW,18.6m Organizing CES 1980
9 Three Gorges Hydropower Station 26x680 MW, 80.6m Preliminary work  

 

 

III POWER TRANSMISSION and Distribution Projects A total of over 50, including about 10 abroad.

 

No. Project Capacity Scope of Services Year of Completion

1

Subs of Chittagong PP, Bangladesh

230KV, 2x150MVA

CES

1992

2

132KV Transmission Line, Pakistan

 

ES

1987

3

Cables for Uhde Gmbh of Germany

VDE0271 NYY-JNYCY,157Km

Supply

1988

4

Subs for textile Mill, and No.6 Electrical Project, Nepal

 

ES

1988

5

Subs of Shanghai Power Supply Bureau

6 Subs of 220 or 110KV

CES

1986

6

Subs for No.3 Steel Mill of Shanghai and for Zunyi Ferroalloy Plant

220KV, 120 MVA each

CES

1990

7

Aluminium refineries in Baotou, Guizhou, Qinghai, etc.

Power transformation and distribution systems

ES

1991

8

Subs of Panzhihua Iron and Steel Co

5 Subs of 220 or 110 KV

ces

1990

 

IV Machinery Works and Projects in Metallurgy and other industries

A total of over 100, including nearly 10 abroad

1.

Heavy Electric Complex, Pakistan

2880 MVA transformers/year

Turn-Key

1992

2.

Bangna Electric Motor Plant, Indonesia

60000 sets (120MW), year

D & CES

1982

3.

Electric Motor Plant, Cuba

30000 sets (150 MW) year

Turn-Key

1992

4.

Farm Implements Factory, Sri Lanka

1 million hoes/year

Turn-Key

1984

5.

Harbin Electric Machinery Works

TG of 1000MW unit and HP

D & ES

1989

6.

Dongfang Electric Machinery Works

Sets with diam. 11.3m runner

D & ES

1989

7.

Electric Motor Works in Xiangtan, Dalian, Lanzhou, etc. Mass production of various motors

Mass production of various motors.

D

1985-90

8.

Zhhujiang Refrigerator Plant, Guangdong

1 million refrg, and 400000air conditioners per year

D

1991

9.

Beijing Renmin Machinery Works

Leading printing machinery

D

1985

10

Diam. 140 seamless tube mill, 2050 hot and 2030 cold strip mills, and sintering & coking project of Baoshan Steel Complez, Shangai

EES jointly with fo reing firms

 

1983-91

11

2nd and rd Phase Projects of 50 million tons/year Qinhuanngdao Coal Terminal

EES

 

1984-90

12

Yingtan-Xiamen,Guangzhou, Hengyang and Datong – Taiyuan electrified railways

EES

 

1987-89

13

Bopp FILM Project of Xiangxi

3000 of 10-40

Turn-Key

1992

14

R&D Building of Research Institute of Machinery Science and Technology

16 storeys, 38000 m2 vibra isolating and thermostatic

D

1986

15

New World Hotel of Beijing, Golden City Mansion of Shen Zhen

Both 18 storrreys, 200000

and 50000m2 respectively

D

16

Garden Hotel of Guangzhou, Great Wall-Sheraton Hotel and Holiday Inn Lido of Beijing

D & ces of

   

 

 

 

Home ] Brief Introduction ] Project Planning And Design ] Thermal Power Generation Projects ] Hydraulic Power Generation Projects ] Power Transmission and Distribution Projects ] Plant Construction and Modernization Projects ] Projects in Metallurgy, Transportation and Other Industries ] Welding Machines and Materials ] International Association ] Quality Control ] [ Major Experiences of CNEEC ]  [Back  to Nobil's Pag]