|
CNEEC is able to
provide hydro-power generating equipment with capacity of 0.024-320 MW, in complete sets
or single units, including various types of turbines for water heads of 2-700m,
generators, governors, valves, automatic control systems, transmission equipment, switch
plants and steel structures. CNEECs activities include the provision of the
following services according to customers requirements, i.e., the model test and
acceptance test of turbine runners, engineering design, technical consultation, equipment
supply, installation and commissioning, personnel training and turn-key projects.
To exploit Chinas hydraulic resources, CNEEC
has participated in supply and services of dozens of large and medium hydro-power
stations, such as the Gezhouba, Shuikou and Dongfend stations and the preliminary work for
the three Gorges Station as well. It has provided more than 20 countries with hydro-power
equipment in complete sets or single units, which are highly commended upon their good
quality.
For small and medium hydro-power stations, CNEEC is capable of supplying a
wide range of seriated and standardized equipment or special one designed to meet
particular requirements by customers, such as Francis, Kaplan, Nagler, Pelton and Turgo
units and mini-solid-assembled sets. Many types of hydro-electric sets can be either
vertical or horizontal, can work at frequency of either 50 or 60 Hz, and can be equipped
with either mechanical- or electro-Hydraulic governors, and different exciters and control
systems.
|
|